Veritek Global Ltd - Air Conditioning Installation

air-conditioning-installation1
air-conditioning-installation2
air-conditioning-installation3
air-conditioning-installation4
air-conditioning-installation5
air-conditioning-installation6
air-conditioning-installation7
air-conditioning-installation8

Air Conditioning Installation - Veritek Global Ltd


Veritek is an award-winning engineering service provision company founded in 1985; headquartered in Eastbourne, East Sussex, UK.

Originally specialising in engineering service provision for the photographic developing and printing markets, Veritek has evolved with the industry, successfully adapting and embracing new technology associated with the change from analogue to digital equipment.

Whilst consolidating its market share in the photo imaging sector, the company has expanded and diversified seamlessly into the Healthcare, Optometry, ATM and Industrial X-ray industries whilst continuing to explore new areas for growth.

In its 20+ years of operation, Veritek has grown to become one of the world’s leading independent exponents of customer orientated, high quality engineering service provision.

Now, with fully owned and controlled operations in the UK, Ireland, Spain, Germany, Italy, France, Holland, Portugal, Czech Republic, Poland, Greece, USA and Australia, the company has a global solution to service.

Project- To supply and install 25 Daikin Inverter Heat Pump Air Conditioning Systems (Energy Efficient)

Main Contractor- MJD Air Conditioning Services Ltd

MJD were contracted by Veritek to carry out the removal of the existing LG air conditioning equipment.

All systems were fully decommissioned and all of the existing refrigerant gas reclaimed as per the current ‘F’ gas regulations.

All of the existing equipment was removed and sent to AC Salvage for re-cycling purposes. The new Daikin high efficiency inverter systems were then installed, commissioned and handed over to the client.

The main workshop areas were supplied with Daikin four way blow roundflow cassettes. The main administration offices, meeting rooms and the reception area were supplied by ducted fan coil units. We feel this was the perfect solutions for these areas, minimising draughts for the office personnel and creating a comfortable working environment. All areas were fitted with remote temperature sensors to improve efficiency and prevent temperature swings. All of the systems have been fitted with the up to date Daikin time clock controllers to provide maximum efficiency.

A five year parts and labour warranty will be in place when the service contract is signed and agreed.