The project

Air Conditioning Installation at Moggerhanger Church

February 2013

Project- MJD were contracted to carry out the replacement of the church heating system. The church had been previously heated via high level electric infa-red heaters. These were proving to be very expensive to run. The decision was made to employ a consultant who would investigate a cheaper form of heating. The following system was approved and MJD were instructed to carry out the required works.

 

Two Mitsubishi Electric 2 Pipe PUHY-EP-250YJM Heat Pump Systems, providing a total heating capacity of 63KW.

The indoor units consisted of the following: Wall mounted fan coils units: Floor Consoles.

The systems have been fully commissioned and handed over to the client. A maintenance contract has now been put in place, which has in turn activated a five year parts and labour warranty.

 

Architect-Levitt Partnership Ltd:     
Mechanical Installation- MJD Air Conditioning Services Ltd.
Electrical Installation- Terry Seymour Electrical Installations Ltd:
Paint Sprayers L.A.Paintworks.
Diamond Drilling Services-B.Taylor Drilling Services Ltd.

 

Matt Dennis

Director MJD Air Conditioning Services Ltd